Selected work

Case studies

A small selection of the work we're proudest of — from iconic leisure attractions to factory-floor M&E. More available on request.

Main contractor — Aviktas, Blackpool Pleasure Beach
2024LeisureMain contractorConstruction

Main contractor — Aviktas, Blackpool Pleasure Beach

Blackpool Pleasure Beach

Build clean, decontamination and handover support on the headline new ride at Blackpool Pleasure Beach, plus the centenary refurb of the Big Dipper.

Factory floor coating for a robotic manufacturing cell
2017Floor careManufacturingCoatings

Factory floor coating for a robotic manufacturing cell

BCW Manufacturing

Hard-wearing, modern-finish floor coating for a newly built robotic manufacturing cell — built to take pallet trucks, cages and constant footfall.

Gas & water mains for a new passivation plant
2016M&EProject managementWorking at height

Gas & water mains for a new passivation plant

BCW Treatments

New gas and water mains feeding a passivation plant, with significant working at height via MEWPs — full RAMS, controls and IPAF-trained operatives.

Drone roof survey of an ageing asbestos roof
2016SurveyDroneRoofing

Drone roof survey of an ageing asbestos roof

Futaba-Tenneco Manufacturing

An aerial drone survey of a large asbestos roof — a fast, safe alternative to scaffolding or MEWPs to scope a long-term replacement strategy.

Cleanroom decontamination on a pharma refurb
2023PharmaDecontaminationCleanroom

Cleanroom decontamination on a pharma refurb

Confidential — UK pharmaceutical client

Three-stage builders' clean, ULV decontamination and EN-tested fogging to bring a refurbished Grade D cleanroom back into validated service.

Polished concrete restoration across a 200,000 sqft DC
2023Floor careLogisticsWarehousing

Polished concrete restoration across a 200,000 sqft DC

Confidential — national logistics operator

Full restoration of a 200,000 sqft polished concrete floor across a live distribution centre, followed by a rolling scrub-and-burnish maintenance regime.

Summer-holiday deep clean & decontamination for a secondary school
2024EducationDeep cleanDecontamination

Summer-holiday deep clean & decontamination for a secondary school

Lancashire secondary academy

Whole-school deep clean, vinyl floor restoration and ULV decontamination delivered across the six-week summer break — ready for first bell.

Builders' clean & FM mobilisation on a 20,000 sqft office fit-out
2024OfficeFit-outSoft FM

Builders' clean & FM mobilisation on a 20,000 sqft office fit-out

Confidential — North West professional services firm

Three-stage post-construction clean on a 20,000 sqft office fit-out, with a seamless rollover into the long-term daily soft-FM contract on day one.

Trusted & accredited

Accredited and audited — so you don't have to worry

The paperwork your buyers, insurers and auditors expect — already in place.

  • Gas Safe Register
  • CHAS
  • CSCS
  • NICEIC Approved Contractor
  • City & Guilds
  • Constructionline
  • SafeContractor Approved
  • IPAF

Ready to talk?

Tell us about the site and we'll come back within one working day with a sensible plan and a clear price.